Fairmont Le Montreux Palace
Contact
Deze website maakt gebruik van cookies. Door deze website te blijven gebruiken, stemt u in met ons gebruik van deze cookies.
meer informatie

Fairmont Le Montreux Palace

CH – Montreux
Renovation of 35 rooms, 5 suites and the L’Atelier in time for the jazz festival
Architect
AEDAS Interiors, London
Project management
VOGLAUER HOTEL CONCEPT
V

All renovation work was done diligently, carefully and very professionally. The schedule we provided was not always easy but it was not only accepted but also adhered to without fail. Daily business with our guests was always respected. We would like to give the team a very big thank you!

Micheal Smithuis // General Manager & Regional Vice President Fairmont Le Montreux Palace
WP_20161212_16_01_23_Pro
K1600_FMPH Bellevue 008 -klein
FMPH Bellevue Suite 001
FMPH Atelier 001
FMPHCHF17 024 W
FMPHCHF17 018 W

This historic 5-star hotel from the Belle Époque has 236 rooms and is situated right on the shore of Lake Geneva. Built in 1906, it is a member of the “Leading Hotels of the World”. This is not only one of the most renowned hotels in the region, but in all of Switzerland. It has also gained fame in connection with the Montreux Jazz Festival, with countless international artists being regulars of the hotel. It is home to the legendary Funky Claude’s Bar, named after the founder of the Montreux Jazz Festival, Claude Nobs. The hotel offers several restaurants, event rooms with a ballroom, and an exclusive 2,000 m² spa area.

V
Demolition & Disassembly
Dry Construction
Floors, Walls & Ceiling
Electrical Work
Baths
Interior Design / Furniture
Lighting
Textiles

This contract included the renovation of 35 rooms, 5 suites and the L’Atelier, as well as replacing the carpets in the Grand Hall. VOGLAUER HOTEL CONCEPT was hired as general contractor for the completion of the interior. Challenges included the different floor plans related to the pre-World War II construction, as well as the stucco ceilings in the suites. The completion of the project had to be done while the hotel was operating with a minimum level of noise. The time frame was extremely tight due to the upcoming jazz festival, but the deadline was met with complete reliability.